Project Name:         Energy Cost:

Building Operating Schedule:

Weekday Hours Open: Weeks/Year: Weekday Hours/Year: 0
Saturday Hours Open: Weekends/Year: Weekend Hours/Year: 0
Sunday Hours Open: Weekends/Year: Total Hours Per Year 0

Space Name:
Room Type:          Room Area (Sq. Ft)          No. of Similar Rooms:
Power Mode: Active Power (Watts): Stand By Power (Watts): No. of Similar
Equipment:
Uncontrolled
kWh/Year:
Equipment #1:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #2:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #3:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #4:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #5:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #6:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #7:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 
Equipment #8:
On Day/On Night
On Day/Off Night
Always On
Sleep Mode
 - 

Plug Load Control Strategy Costs:

Material Costs

Labor Costs

Total Costs

Schedule Based Control $ $ $ - 
Occupancy Based Control $ $ $ - 

Plug Load Control Energy Use Analysis: Estimated Usage Energy Savings with Control Strategy:
Baseline:  -  kWh/yr
 
Schedule Based Control:  -  kWh/yr  -  kWh/yr
Occupancy Based Control:  -  kWh/yr  -  kWh/yr
 

Plug Load Control Summary:

Annual Operating Cost Comparison Energy Savings/Yr Proposed Energy Cost/Yr Simple Payback(Yrs) Energy Cost/Sq. Ft.
Baseline: $ -  $ -   -  $ - 
Schedule Based Control: $ -  $ -   -  $ - 
Occupancy Based Control: $ -  $ -   -  $ -